With regard to the Building Regulations 2000, can anyone be considered exempt from the regulations?

Yes, the following parties can be considered exempt:

	Non-profit local bodies;

	Buildings that belong to ‘statutory bodies’, such as water boards;

	Crown buildings;

	Buildings in Inner London;

	Buildings related to the United Kingdom Atomic Energy Authority.