This ensures that each and every tenderer has equal opportunity to participate in the tender process. This will be on a fair basis by putting forward a bid tailored to the criteria determined by the selecting authority.
This ensures that each and every tenderer has equal opportunity to participate in the tender process. This will be on a fair basis by putting forward a bid tailored to the criteria determined by the selecting authority.