Under these circumstances, the local authority is entitled to prosecute. A maximum fine of £5,000 is applicable, plus £50 per day can be added for each day after this verdict has been made should the contravention not be corrected.
Under these circumstances, the local authority is entitled to prosecute. A maximum fine of £5,000 is applicable, plus £50 per day can be added for each day after this verdict has been made should the contravention not be corrected.