ReachBack
What is the purpose of a preliminary building site assessment?
Planning and Architecture
Part C Site prep
Build_Regs_Advisors
15 February 2013 12:37
2
This is intended to provide concrete information regarding both past and present uses of the site.
Related Topics
Topic
Replies
Views
Activity
What is involved in preparatory investigation of a potential building site?
Part C Site prep
1
479
15 February 2013
Are there any particular processes that should be included within the risk assessment for a building construction site?
Part C Site prep
1
469
15 February 2013
What is the best way of determining how much unsuitable material should be removed before commencing building work?
Part C Site prep
1
540
15 February 2013
If an individual wishes to engage in building work related to foundations, excavations for foundations, any damp-proof course, any concrete or other material to be laid over a site and drains or sewers, how many days’ notice needs to be given to the loca
Part C Site prep
1
396
7 February 2013
With regard to a building site, when is a geotechnical and geo-environmental investigation to be considered?
Part C Site prep
1
417
15 February 2013