We have been told that our cooling tower has the legionnella bacteria and this will have been released into the surrounding area

We have been told that our cooling tower has the legionnella bacteria and this will have been released into the surrounding area.

No. The escape or release of a biological agent must only be reported if it causes severe human infection or illness. In practice, this means a biological agent in hazard groups 3 or 4 in Part V, Schedule 3 of the Control of Substances Hazardous to Health Regulations 2002 (COSHH). Legionnella is in group 2, so it is not reportable.