This varies greatly depending upon the type and extent of development. The following is a rough guide to some of the prices involved:
Site not exceeding 2.5 hectares - £335 per 0.1 ha ;
Site exceeding 2.5 ha an additional £100 per each, maximum £125,000;
Dwellings – erection of new Up to 50 dwellings, £335 per dwelling house, maximum £125,000;
Over 50 dwellings, £100 each additional unit, maximum £250,000.