This involves a property being assessed across the following nine categories:
· Energy/CO2;
· water;
· materials;
· surface water run-off;
· waste;
· pollution;
· health & well-being;
· management;
· ecology.
The legislation sets minimum standards for each category which must be met, as well as an overall total which also has to be satisfied.