A telecoms cable was struck, causing a flash. Is it reportable?

A telecoms cable was struck, causing a flash. Is it reportable?

No, Telecoms cables and Cable TV cables are normally below 50 Vac or 125 Vdc and the amount of energy in the flash is unlikely to cause death.