A driver was seriously injured in a collision with another vehicle on a motorway

No. The driver’s injuries resulted from the movement of a vehicle on a road and hence there is no need to report the accident. However, the accident should be reported to the police.

1 Like

No. The driver’s injuries resulted from the movement of a vehicle on a road and hence there is no need to report the accident. However, the accident should be reported to the police.