# With regards to planning permission, what is meant by ‘block plans’?

**URL:** <https://reachback.builtintelligence.com/t/with-regards-to-planning-permission-what-is-meant-by-block-plans/2528>\
**Category:** General\
**Created:** [7 February 2013 13:56 UTC](https://reachback.builtintelligence.com/t/with-regards-to-planning-permission-what-is-meant-by-block-plans/2528 "2013-02-07T13:56:19Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [7 February 2013 13:56 UTC](https://reachback.builtintelligence.com/t/with-regards-to-planning-permission-what-is-meant-by-block-plans/2528/1 "2013-02-07T13:56:19Z")

</div>



---

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [7 February 2013 13:56 UTC](https://reachback.builtintelligence.com/t/with-regards-to-planning-permission-what-is-meant-by-block-plans/2528/2 "2013-02-07T13:56:27Z")

</div>

This is an in-depth plan of a certain area that includes existing and proposed buildings, and other features of the region, such as trees, waterways, access routes, drainage, etc.