# What is the problem?

**URL:** <https://reachback.builtintelligence.com/t/what-is-the-problem/1183>\
**Category:** General Construction\
**Created:** [13 January 2013 08:07 UTC](https://reachback.builtintelligence.com/t/what-is-the-problem/1183 "2013-01-13T08:07:39Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 08:07 UTC](https://reachback.builtintelligence.com/t/what-is-the-problem/1183/1 "2013-01-13T08:07:39Z")

</div>



---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [25 January 2013 11:13 UTC](https://reachback.builtintelligence.com/t/what-is-the-problem/1183/2 "2013-01-25T11:13:48Z")

</div>

Semi automatic hitches require a ‘pin’ to be inserted in order to lock off and secure the connection. If this pin is not inserted then the machine will still work, but in the event of a loss of power it will work itself loose and the bucket/ attachment will fall off. The real danger is that this could take half a minute or half an hour which makes it unpredictable.
