# What is the Incentive Schedule?

**URL:** <https://reachback.builtintelligence.com/t/what-is-the-incentive-schedule/1012>\
**Category:** Secondary X, W and Y options\
**Created:** [14 November 2012 15:04 UTC](https://reachback.builtintelligence.com/t/what-is-the-incentive-schedule/1012 "2012-11-14T15:04:08Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Rob\_Glasspool](https://avatars.discourse-cdn.com/v4/letter/r/a88e57/32.png) [@Rob\_Glasspool](https://reachback.builtintelligence.com/u/Rob_Glasspool)\
**Post date:** [14 November 2012 15:04 UTC](https://reachback.builtintelligence.com/t/what-is-the-incentive-schedule/1012/1 "2012-11-14T15:04:08Z")

</div>

What is the Incentive Schedule?

---

<div class="post-metadata">

**Author:** ![Rob\_Glasspool](https://avatars.discourse-cdn.com/v4/letter/r/a88e57/32.png) [@Rob\_Glasspool](https://reachback.builtintelligence.com/u/Rob_Glasspool)\
**Post date:** [14 November 2012 15:04 UTC](https://reachback.builtintelligence.com/t/what-is-the-incentive-schedule/1012/2 "2012-11-14T15:04:25Z")

</div>

It is a document which provides details of the performance that the KPI is intended to measure, the method of measuring it, the target or level of performance that is to be achieved and the amount to be paid to the Contractor if it is met.