# What is the Equipment?

**URL:** <https://reachback.builtintelligence.com/t/what-is-the-equipment/403>\
**Category:** General\
**Created:** [12 October 2012 14:52 UTC](https://reachback.builtintelligence.com/t/what-is-the-equipment/403 "2012-10-12T14:52:14Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![BuiltIntelligence](https://avatars.discourse-cdn.com/v4/letter/b/919ad9/32.png) [@BuiltIntelligence](https://reachback.builtintelligence.com/u/BuiltIntelligence)\
**Post date:** [12 October 2012 14:52 UTC](https://reachback.builtintelligence.com/t/what-is-the-equipment/403/1 "2012-10-12T14:52:14Z")

</div>

What is the Equipment?

---

<div class="post-metadata">

**Author:** ![BuiltIntelligence](https://avatars.discourse-cdn.com/v4/letter/b/919ad9/32.png) [@BuiltIntelligence](https://reachback.builtintelligence.com/u/BuiltIntelligence)\
**Post date:** [12 October 2012 14:52 UTC](https://reachback.builtintelligence.com/t/what-is-the-equipment/403/2 "2012-10-12T14:52:32Z")

</div>

Items that are provided and used by the Contractor to Provide the Works, and which are not required to be included in the works by the Works Information are Equipment under Clause 11.2(7). Examples include: vehicles; tools; temporary works; or cabins. Where the terms ‘plant’ or ‘constructional plant’ have previously been used in UK building and civil engineering, Equipment is now used.