# What is the best way of determining how much unsuitable material should be removed before commencing building work?

**URL:** <https://reachback.builtintelligence.com/t/what-is-the-best-way-of-determining-how-much-unsuitable-material-should-be-removed-before-commencing-building-work/2758>\
**Category:** Part C Site prep\
**Created:** [15 February 2013 12:34 UTC](https://reachback.builtintelligence.com/t/what-is-the-best-way-of-determining-how-much-unsuitable-material-should-be-removed-before-commencing-building-work/2758 "2013-02-15T12:34:25Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [15 February 2013 12:34 UTC](https://reachback.builtintelligence.com/t/what-is-the-best-way-of-determining-how-much-unsuitable-material-should-be-removed-before-commencing-building-work/2758/1 "2013-02-15T12:34:25Z")

</div>



---

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [15 February 2013 12:34 UTC](https://reachback.builtintelligence.com/t/what-is-the-best-way-of-determining-how-much-unsuitable-material-should-be-removed-before-commencing-building-work/2758/2 "2013-02-15T12:34:37Z")

</div>

It is generally recommended to achieve this by undergoing a site investigation.