# What is short duration work?

**URL:** <https://reachback.builtintelligence.com/t/what-is-short-duration-work/1151>\
**Category:** General Construction\
**Created:** [13 January 2013 07:22 UTC](https://reachback.builtintelligence.com/t/what-is-short-duration-work/1151 "2013-01-13T07:22:21Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 07:22 UTC](https://reachback.builtintelligence.com/t/what-is-short-duration-work/1151/1 "2013-01-13T07:22:21Z")

</div>



---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [25 January 2013 11:27 UTC](https://reachback.builtintelligence.com/t/what-is-short-duration-work/1151/2 "2013-01-25T11:27:38Z")

</div>

Short duration work means tasks that are measured in minutes rather than hours e.g. replacing a few of broken tiles on a roof or adjusting a television aerial.