# What information do I have to pass on and how should I do it?

**URL:** <https://reachback.builtintelligence.com/t/what-information-do-i-have-to-pass-on-and-how-should-i-do-it/1335>\
**Category:** CDM\
**Created:** [13 January 2013 10:02 UTC](https://reachback.builtintelligence.com/t/what-information-do-i-have-to-pass-on-and-how-should-i-do-it/1335 "2013-01-13T10:02:31Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 10:02 UTC](https://reachback.builtintelligence.com/t/what-information-do-i-have-to-pass-on-and-how-should-i-do-it/1335/1 "2013-01-13T10:02:31Z")

</div>



---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [24 January 2013 13:26 UTC](https://reachback.builtintelligence.com/t/what-information-do-i-have-to-pass-on-and-how-should-i-do-it/1335/2 "2013-01-24T13:26:08Z")

</div>

You should inform others about project-specific significant residual risks. This should focus on risks that may not be obvious to those who use the design. One good way of communicating this information is using notes on drawings. If you are not sure what information should be passed on talk to the CDM co-ordinator or contractor about what they need to know.
