# What does Site Investigation Information mean in a planning context?

**URL:** <https://reachback.builtintelligence.com/t/what-does-site-investigation-information-mean-in-a-planning-context/2136>\
**Category:** Planning Regs\
**Created:** [29 January 2013 12:42 UTC](https://reachback.builtintelligence.com/t/what-does-site-investigation-information-mean-in-a-planning-context/2136 "2013-01-29T12:42:46Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Planning\_Portal](https://avatars.discourse-cdn.com/v4/letter/p/6f9a4e/32.png) [@Planning\_Portal](https://reachback.builtintelligence.com/u/Planning_Portal)\
**Post date:** [29 January 2013 12:42 UTC](https://reachback.builtintelligence.com/t/what-does-site-investigation-information-mean-in-a-planning-context/2136/1 "2013-01-29T12:42:46Z")

</div>



---

<div class="post-metadata">

**Author:** ![Planning\_Portal](https://avatars.discourse-cdn.com/v4/letter/p/6f9a4e/32.png) [@Planning\_Portal](https://reachback.builtintelligence.com/u/Planning_Portal)\
**Post date:** [29 January 2013 12:42 UTC](https://reachback.builtintelligence.com/t/what-does-site-investigation-information-mean-in-a-planning-context/2136/2 "2013-01-29T12:42:58Z")

</div>

Includes a risk assessment of land potentially affected by contamination, or ground stability and slope stability reports, as appropriate. All investigations of land potentially affected by contamination should be carried out in accordance with established procedures (such as BS10175 (2001) Code of Practice for the Investigation of Potentially Contaminated Sites). The minimum information that should be provided by an applicant is the report of a desk study and site reconnaissance.