# What does Listed Building mean in a planning context?

**URL:** <https://reachback.builtintelligence.com/t/what-does-listed-building-mean-in-a-planning-context/2022>\
**Category:** Planning Regs\
**Created:** [29 January 2013 10:40 UTC](https://reachback.builtintelligence.com/t/what-does-listed-building-mean-in-a-planning-context/2022 "2013-01-29T10:40:22Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Planning\_Portal](https://avatars.discourse-cdn.com/v4/letter/p/6f9a4e/32.png) [@Planning\_Portal](https://reachback.builtintelligence.com/u/Planning_Portal)\
**Post date:** [29 January 2013 10:40 UTC](https://reachback.builtintelligence.com/t/what-does-listed-building-mean-in-a-planning-context/2022/1 "2013-01-29T10:40:22Z")

</div>



---

<div class="post-metadata">

**Author:** ![Planning\_Portal](https://avatars.discourse-cdn.com/v4/letter/p/6f9a4e/32.png) [@Planning\_Portal](https://reachback.builtintelligence.com/u/Planning_Portal)\
**Post date:** [29 January 2013 10:40 UTC](https://reachback.builtintelligence.com/t/what-does-listed-building-mean-in-a-planning-context/2022/2 "2013-01-29T10:40:33Z")

</div>

A building of special architectural or historic interest. Listed buildings are graded I, II\* or II with grade I being the highest. Listing includes the interior as well as the exterior of the building, and any buildings or permanent structures (e.g. wells within its curtilage). English Heritage is responsible for designating buildings for listing in England.
