# What changed in the asbestos regulations in 2012?

**URL:** <https://reachback.builtintelligence.com/t/what-changed-in-the-asbestos-regulations-in-2012/1447>\
**Category:** Asbestos\
**Created:** [13 January 2013 11:44 UTC](https://reachback.builtintelligence.com/t/what-changed-in-the-asbestos-regulations-in-2012/1447 "2013-01-13T11:44:53Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 11:44 UTC](https://reachback.builtintelligence.com/t/what-changed-in-the-asbestos-regulations-in-2012/1447/1 "2013-01-13T11:44:53Z")

</div>

What changed in the asbestos regulations in 2012?

---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [14 January 2013 02:04 UTC](https://reachback.builtintelligence.com/t/what-changed-in-the-asbestos-regulations-in-2012/1447/2 "2013-01-14T02:04:56Z")

</div>

The Control of Asbestos Regulations 2012 came into force on 6 April 2012, updating previous asbestos regulations to take account of the European Commission’s view that the UK had not fully implemented the EU Directive on exposure to asbestos (Directive 2009/148/EC).

```
In practice the changes are fairly limited. They mean that some types of non-licensed work with asbestos now have additional requirements – notification of work, medical surveillance and record keeping. All other requirements remain unchanged.

[Control of Asbestos Regulations 2012](http://www.hse.gov.uk/asbestos/regulations.htm)
```