# What are the consequences of living in a Conservation Area when applying for planning permission?

**URL:** <https://reachback.builtintelligence.com/t/what-are-the-consequences-of-living-in-a-conservation-area-when-applying-for-planning-permission/2532>\
**Category:** Part L Conservation\
**Created:** [7 February 2013 13:58 UTC](https://reachback.builtintelligence.com/t/what-are-the-consequences-of-living-in-a-conservation-area-when-applying-for-planning-permission/2532 "2013-02-07T13:58:15Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [7 February 2013 13:58 UTC](https://reachback.builtintelligence.com/t/what-are-the-consequences-of-living-in-a-conservation-area-when-applying-for-planning-permission/2532/1 "2013-02-07T13:58:15Z")

</div>



---

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [7 February 2013 13:58 UTC](https://reachback.builtintelligence.com/t/what-are-the-consequences-of-living-in-a-conservation-area-when-applying-for-planning-permission/2532/2 "2013-02-07T13:58:29Z")

</div>

Should you live within such a region then planning permission is required for the following:

```
	demolishing a building;

	demolishing a gate, fence, wall or railing should it be over one metre in height and next to a highway, or over two metres in height at any other location.
```