# What about asbestos removal?

**URL:** <https://reachback.builtintelligence.com/t/what-about-asbestos-removal/1441>\
**Category:** Asbestos\
**Created:** [13 January 2013 11:43 UTC](https://reachback.builtintelligence.com/t/what-about-asbestos-removal/1441 "2013-01-13T11:43:05Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 11:43 UTC](https://reachback.builtintelligence.com/t/what-about-asbestos-removal/1441/1 "2013-01-13T11:43:05Z")

</div>

What about asbestos removal?

---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [14 January 2013 02:28 UTC](https://reachback.builtintelligence.com/t/what-about-asbestos-removal/1441/2 "2013-01-14T02:28:02Z")

</div>

The removal of higher risk asbestos-containing materials (sprayed asbestos coatings, asbestos insulation, asbestos lagging and most work involving asbestos insulating board (AIB) should only be carried out by a licensed contractor.

```
	Licensed asbestos removal work is a significantly hazardous job because it involves higher risk asbestos-containing materials (ACMs). These materials are more likely to release larger quantities of asbestos fibres when being removed than lower risk materials (such as asbestos cement). As a result, workers who are employed in removing higher risk ACMs require specific training and should follow specific working practices. Workers should also use sophisticated respiratory protective equipment (RPE) and are legally required to be under regular medical surveillance. It is because of the hazardous nature of this work that a licence to do it is required from HSE. You can find further information on the HSE licensing process on the [Asbestos licensing](http://www.hse.gov.uk/asbestos/licensing/index.htm) page.

	There are some asbestos removal tasks, involving lower risk asbestos-containing materials that do not require a licence. This is because any exposure to asbestos fibres from this type of work is not expected to present a significant risk, provided that the correct precautions are taken. However, under the asbestos regulations that came into force in April 2012, there are now two categories of 'non-licensed' work, one of which, 'notifiable non-licensed work (NNLW)', has additional requirements for employers. For more information on what work is classified as [NNLW](http://www.hse.gov.uk/asbestos/licensing/notifiable-non-licensed-work.htm). HSE has produced a series of task sheets on the appropriate controls for non-licensed work.
```