# Under the Building Act 1984, is it legally permissible for a public body to supervise its own work?

**URL:** <https://reachback.builtintelligence.com/t/under-the-building-act-1984-is-it-legally-permissible-for-a-public-body-to-supervise-its-own-work/2401>\
**Category:** General\
**Created:** [6 February 2013 14:50 UTC](https://reachback.builtintelligence.com/t/under-the-building-act-1984-is-it-legally-permissible-for-a-public-body-to-supervise-its-own-work/2401 "2013-02-06T14:50:32Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [6 February 2013 14:50 UTC](https://reachback.builtintelligence.com/t/under-the-building-act-1984-is-it-legally-permissible-for-a-public-body-to-supervise-its-own-work/2401/1 "2013-02-06T14:50:32Z")

</div>



---

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [6 February 2013 14:50 UTC](https://reachback.builtintelligence.com/t/under-the-building-act-1984-is-it-legally-permissible-for-a-public-body-to-supervise-its-own-work/2401/2 "2013-02-06T14:50:40Z")

</div>

Yes. Under these circumstances the public body is required to provide the local authority with a ‘public bodies notice’ which must be approved by the local authority before this plan can be considered acceptable.