# Release Notes up to 2026-05-23 Contract Management Sprint 142

**URL:** <https://reachback.builtintelligence.com/t/release-notes-up-to-2026-05-23-contract-management-sprint-142/22634>\
**Category:** Product Release Notes\
**Tags:** fastdraft\
**Created:** [27 May 2026 13:17 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-05-23-contract-management-sprint-142/22634 "2026-05-27T13:17:04Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![liz\_exley](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/liz_exley/32/623_2.png) [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Post date:** [27 May 2026 13:17 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-05-23-contract-management-sprint-142/22634/1 "2026-05-27T13:17:04Z")

</div>

This release contains new features, improvements and bug fixes.

# \ ***New features**

- There is new functionality to schedule an aggregate report to be run Daily/Weekly/Monthly so that reporting can be managed more efficiently across all of the contracts that the requester has access to. If they have scheduled multiple aggregate reports to be produced on the same day, FastDraft will wait until all of those are complete and then send a single email, separately listing the successful reports and any failed reports along with a link to securely download a zip file containing all successfully generated reports so that individual downloads are not required and so that standard naming conventions will apply (in case the user has automations linked to exact filenames).

# \ ***Improvements**

- We have added a Clause/Type dropdown to the new Variation Order workflow [85] so that a Project Manager working on an IChemE or AS4000 contract can select a clause to make clear which clause they are notifying/directing under when issuing a Variation Order so they are sure to be contractually compliant.

- When clicking on a calendar item link to a manual action it will take the user to a pre-filtered actions register showing that item only.

- We have introduced an optional toggle that can be configured on a contract template to allow the PM to decide to notify a CEN or a Proposed Instruction or reply to a Supplier CEN without including an instruction to quote.

- When grouping clauses by Workflow under the Create New via Clause Type button if a workflow exists but clause list is blank then the Page Title Should appear in that group as a selectable clause. This might occur if it is an old contract template and unified clauses have not been switched on for the group.

# \ ***Bug Fixes**

- Lead users of different parties were being notified by email even if email notifications were not configured to notify that party (the API continued to block access where appropriate)
- Unable to download a communicated notice (print and save to pdf was still working)