# Release Notes up to 2021-08-20 Contract Management (Sprint 19)

**URL:** <https://reachback.builtintelligence.com/t/release-notes-up-to-2021-08-20-contract-management-sprint-19/15772>\
**Category:** Product Release Notes\
**Tags:** fastdraft\
**Created:** [30 August 2021 08:49 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2021-08-20-contract-management-sprint-19/15772 "2021-08-30T08:49:59Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![adrian.von.plato](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/adrian.von.plato/32/620_2.png) [@adrian.von.plato](https://reachback.builtintelligence.com/u/adrian.von.plato)\
**Post date:** [30 August 2021 08:49 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2021-08-20-contract-management-sprint-19/15772/1 "2021-08-30T08:49:59Z")

</div>

# **New + Improved**

**Platform as a Service (PaaS)** \*\*

PaaS will provide more scalable, reliable and performance optimized infrastructure for the FD platform. This will provide improved performance to our users (faster load times) as well as improved reliability allowing us to recover from “disasters” more efficiently and effectively.

**Update to Aggregate reports to use a Vertical Pipe delimiter rather than a comma** ^^

Formatting of the reports have been changed to aid extracting required data for reporting in third party tools as such as Power BI and data manipulation in Excel.

**Include users email address in user dropdown on Contract / Contract Users configuration pages** ^^

Previously when assigning users to a contract the drop down only contained names. We can now distinguish between two users with the same name (e.g. Chris Corr) but different emails - [ccorr@builtintelligence.com](mailto:ccorr@builtintelligence.com) and [chriscorr@builtintelligence.com](mailto:chriscorr@builtintelligence.com) as the email is now also displayed. This enhancement will help avoid accidently assigning the wrong user to a contract.

 ![mceclip0.png](https://europe1.discourse-cdn.com/flex013/uploads/builtintelligence/original/1X/eb8c3e34fb7462da6373b1267a4c0cf4d2c0c8a8.png)

**Add support for 2 additional reject reasons on program workflow** ^^

There are now 2 additional reject reasons that can be made available and customisable on the on programme workflow

**Increased max allowable size for the CE type field**

**Updated API / Swagger documentation**

We are improving our API documentation to help customers who want to integrate with our API. This will provide them with detailed information about the methods and models each request requires and provide a “try it” feature for the users.

**Updated aggregate reports** ^^

The aggregated reports have been updated to include more information, Contract ID, Project id, Form ID, Currency and a full URL link to notification within the platform rather than a hyperlink.

**UI Improvements**

Validation when adding contract users based on the party and users company

 ![mceclip0.png](https://europe1.discourse-cdn.com/flex013/uploads/builtintelligence/original/1X/088e7bc8ddef89a5a2490bd143d194b7e2c11908.png)

Text improvements on Communications button for associated workflows

Disabling login fields while action is processing.

## **Notes**

**Notes**

^^ Items marked with a double up arrow require specific permissions or subscription types before they are available.

\*\* Items marked with a double asterix will provide improved scalability, performance and reliability for the platform and will be rolled out in the near future.
