# No MoM stated in Option B Contract

**URL:** <https://reachback.builtintelligence.com/t/no-mom-stated-in-option-b-contract/19837>\
**Category:** NEC3 and NEC4 Contracts\
**Created:** [17 February 2023 13:37 UTC](https://reachback.builtintelligence.com/t/no-mom-stated-in-option-b-contract/19837 "2023-02-17T13:37:29Z")\
**Posts on this page:** 5\
**Page:** 1

<div class="post-metadata">

**Author:** ![AdamJohn](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/adamjohn/32/999_2.png) [@AdamJohn](https://reachback.builtintelligence.com/u/AdamJohn)\
**Post date:** [17 February 2023 13:37 UTC](https://reachback.builtintelligence.com/t/no-mom-stated-in-option-b-contract/19837/1 "2023-02-17T13:37:29Z")

</div>

What to do if there is no method of measurement stated in contract data part 1 on an option B contract. Bill of Quantities has been provided but no method stated

Thanks

---

<div class="post-metadata">

**Author:** ![dave\_bates](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/dave_bates/32/55_2.png) [@dave\_bates](https://reachback.builtintelligence.com/u/dave_bates)\
**Post date:** [18 February 2023 14:54 UTC](https://reachback.builtintelligence.com/t/no-mom-stated-in-option-b-contract/19837/2 "2023-02-18T14:54:34Z")

</div>

can the mom be inferred by the item coding and/or descriptions?

---

<div class="post-metadata">

**Author:** ![AdamJohn](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/adamjohn/32/999_2.png) [@AdamJohn](https://reachback.builtintelligence.com/u/AdamJohn)\
**Post date:** [20 February 2023 09:32 UTC](https://reachback.builtintelligence.com/t/no-mom-stated-in-option-b-contract/19837/3 "2023-02-20T09:32:18Z")

</div>

not 100% sure on what the mom is from the item description. would not stating a mom be the employers risk though?

---

<div class="post-metadata">

**Author:** ![dave\_bates](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/dave_bates/32/55_2.png) [@dave\_bates](https://reachback.builtintelligence.com/u/dave_bates)\
**Post date:** [20 February 2023 18:54 UTC](https://reachback.builtintelligence.com/t/no-mom-stated-in-option-b-contract/19837/4 "2023-02-20T18:54:33Z")

</div>

It’s an extreme situation and could possibly be argued that you have signed up to a lump sum because remeasurement is not operable. Have you approached the PM on the matter

---

<div class="post-metadata">

**Author:** ![chriscorr](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/chriscorr/32/1317_2.png) [@chriscorr](https://reachback.builtintelligence.com/u/chriscorr)\
**Post date:** [24 February 2023 17:10 UTC](https://reachback.builtintelligence.com/t/no-mom-stated-in-option-b-contract/19837/5 "2023-02-24T17:10:21Z")

</div>

Adam did you set how the BOQ was preared in to the BOQ i.e. a preambles?