# NEC4 ECSS Defined Cost and Fee

**URL:** <https://reachback.builtintelligence.com/t/nec4-ecss-defined-cost-and-fee/21294>\
**Category:** Compensation Events\
**Tags:** nec\
**Created:** [19 September 2023 11:20 UTC](https://reachback.builtintelligence.com/t/nec4-ecss-defined-cost-and-fee/21294 "2023-09-19T11:20:57Z")\
**Posts on this page:** 1\
**Showing post:** 3

<div class="post-metadata">

**Author:** ![MJD](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/mjd/32/338_2.png) [@MJD](https://reachback.builtintelligence.com/u/MJD)\
**Post date:** [19 September 2023 14:55 UTC](https://reachback.builtintelligence.com/t/nec4-ecss-defined-cost-and-fee/21294/3 "2023-09-19T14:55:33Z")

</div>

I was sure I’d seen a similar post before, here’s the link:

[NEC ECC: Addition of fee to CECA Equipment Rates - NEC3 and NEC4 Contracts / SOCC SSOCC - ReachBack (builtintelligence.com)](https://reachback.builtintelligence.com/t/nec-ecc-addition-of-fee-to-ceca-equipment-rates/5977)

---

_[View the full topic](https://reachback.builtintelligence.com/t/nec4-ecss-defined-cost-and-fee/21294)._