# NEC4 ECC PM Scope of Services

**URL:** <https://reachback.builtintelligence.com/t/nec4-ecc-pm-scope-of-services/21283>\
**Category:** NEC3 and NEC4 Contracts\
**Tags:** psc\
**Created:** [12 September 2023 20:45 UTC](https://reachback.builtintelligence.com/t/nec4-ecc-pm-scope-of-services/21283 "2023-09-12T20:45:21Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Mapreader](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/mapreader/32/60_2.png) [@Mapreader](https://reachback.builtintelligence.com/u/Mapreader)\
**Post date:** [12 September 2023 20:45 UTC](https://reachback.builtintelligence.com/t/nec4-ecc-pm-scope-of-services/21283/1 "2023-09-12T20:45:21Z")

</div>

Hi All,

Has ICE / NEC / other Consultancies ever advised on the typical NEC4 ECC Option A PM Scope of Services.

So, for example a Client intends to appoint a consultant/third party to act as NEC4 PM for lets say on an ECC Option A or ECSC construction project. The Client intends to use a NEC4 PSC Option A for the agreement between them and Consultant. Is there a typical template for the scope of services, outlining what the NEC4 PM will do? e.g: pre-contract advise of NEC contract, draft NEC contract, act as NEC PM (in compliance with 9 clauses), use software to manage etc.

I have often referred to RICS PM Scope of services, but wondered if ICE/NEC have ever drafted one.

Many thanks