# NEC 4 Framework Contract

**URL:** <https://reachback.builtintelligence.com/t/nec-4-framework-contract/21997>\
**Category:** NEC3 and NEC4 Contracts\
**Created:** [8 November 2024 13:15 UTC](https://reachback.builtintelligence.com/t/nec-4-framework-contract/21997 "2024-11-08T13:15:11Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![michael.donnelly](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/michael.donnelly/32/1458_2.png) [@michael.donnelly](https://reachback.builtintelligence.com/u/michael.donnelly)\
**Post date:** [8 November 2024 13:15 UTC](https://reachback.builtintelligence.com/t/nec-4-framework-contract/21997/1 "2024-11-08T13:15:11Z")

</div>

Hi,

Is it possible to have an Infrastructure Conditions of Contract (ICC) used under the NEC4 ECC Framework Contract, or does some form of ECC Contract have to be used when the over arching Contract is the NEC Framework Contract?

Thanks  
Michael