How should the Project Manager assess a number of compensation events occuring at the same time?

How should the Project Manager assess a number of compensation events occuring at the same time?

1 Like

In theory each compensation event should be considered on an individual basis. However is such circumstances as described it can make a great deal of sense to consider all the events together at the same time.

Not pure nec but a practical way to manage it.