# How do I notify notifiable non-licensed work?

**URL:** <https://reachback.builtintelligence.com/t/how-do-i-notify-notifiable-non-licensed-work/1450>\
**Category:** Asbestos\
**Created:** [13 January 2013 11:46 UTC](https://reachback.builtintelligence.com/t/how-do-i-notify-notifiable-non-licensed-work/1450 "2013-01-13T11:46:02Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 11:46 UTC](https://reachback.builtintelligence.com/t/how-do-i-notify-notifiable-non-licensed-work/1450/1 "2013-01-13T11:46:02Z")

</div>

How do I notify notifiable non-licensed work?

---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [14 January 2013 01:56 UTC](https://reachback.builtintelligence.com/t/how-do-i-notify-notifiable-non-licensed-work/1450/2 "2013-01-14T01:56:02Z")

</div>

To determine whether the work you are doing is classified as notifiable non-licensed work (NNLW), check the [NNLW information](http://www.hse.gov.uk/asbestos/licensing/notifiable-non-licensed-work.htm).

```
	Once you have confirmed the work is NNLW, you need to notify it to the relevant enforcing authority. Do this online, via a computer or Smartphone, at the [online notifications form](https://extranet.hse.gov.uk/lfserver/external/asbnnlw1). All three possible enforcing authorities can be notified via this route. This is the only method of notification - you can't notify by phone or post;

	Notice should be given before the work starts - there is no minimum notice period. You do not need to wait for permission to permission from the enforcing authority - the database will provide a PDF copy of your notification. If you are a licensed asbestos contractor carrying out NNLW work, you will still need to notify.
```
