# How can I save the E-form?

**URL:** <https://reachback.builtintelligence.com/t/how-can-i-save-the-e-form/1288>\
**Category:** CDM\
**Created:** [13 January 2013 09:34 UTC](https://reachback.builtintelligence.com/t/how-can-i-save-the-e-form/1288 "2013-01-13T09:34:30Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 09:34 UTC](https://reachback.builtintelligence.com/t/how-can-i-save-the-e-form/1288/1 "2013-01-13T09:34:30Z")

</div>



---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [25 January 2013 10:25 UTC](https://reachback.builtintelligence.com/t/how-can-i-save-the-e-form/1288/2 "2013-01-25T10:25:50Z")

</div>

The best way is to save the E-Form to pdf format as this retains the logo and has a good resolution. On the Declaration screen select ‘Print / Save form details’ button.  
The printable version will load in a separate browser window.

From the Menu bar at the top of the window select File \> Print and select Adobe PDF as your print option.

This will save a read only pdf. file that you can retain and or email as you wish.