# How can construction dust harm me?

**URL:** <https://reachback.builtintelligence.com/t/how-can-construction-dust-harm-me/1232>\
**Category:** General Construction\
**Created:** [13 January 2013 08:47 UTC](https://reachback.builtintelligence.com/t/how-can-construction-dust-harm-me/1232 "2013-01-13T08:47:23Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 08:47 UTC](https://reachback.builtintelligence.com/t/how-can-construction-dust-harm-me/1232/1 "2013-01-13T08:47:23Z")

</div>



---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [25 January 2013 10:52 UTC](https://reachback.builtintelligence.com/t/how-can-construction-dust-harm-me/1232/2 "2013-01-25T10:52:00Z")

</div>

Anyone who breathes in these dusts should know the damage they can do to the lungs and airways. The main dust related diseases affecting construction workers are:

```
	Lung cancer

	Silicosis

	Chronic Obstructive Pulmonary Disorder (see also [Chronic obstructive pulmonary disease (COPD)](http://www.hse.gov.uk/copd/) )

	Asthma (see also the [Asthma](http://www.hse.gov.uk/asthma/) site)

While some of lung disease like advanced silicosis can come on quite quickly, most take a long time. Often this is over years. They happen because during this time regularly breathing even small amounts of dust adds up and damages the lungs and airways. Unfortunately, by the time you notice the damage is often done and it is more difficult to treat.
```