# From which bodies might the Contractor be required to obtain approval for his designs?

**URL:** <https://reachback.builtintelligence.com/t/from-which-bodies-might-the-contractor-be-required-to-obtain-approval-for-his-designs/511>\
**Category:** General\
**Created:** [12 October 2012 17:56 UTC](https://reachback.builtintelligence.com/t/from-which-bodies-might-the-contractor-be-required-to-obtain-approval-for-his-designs/511 "2012-10-12T17:56:49Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![BuiltIntelligence](https://avatars.discourse-cdn.com/v4/letter/b/919ad9/32.png) [@BuiltIntelligence](https://reachback.builtintelligence.com/u/BuiltIntelligence)\
**Post date:** [12 October 2012 17:56 UTC](https://reachback.builtintelligence.com/t/from-which-bodies-might-the-contractor-be-required-to-obtain-approval-for-his-designs/511/1 "2012-10-12T17:56:49Z")

</div>

From which bodies might the Contractor be required to obtain approval for his designs?

---

<div class="post-metadata">

**Author:** ![BuiltIntelligence](https://avatars.discourse-cdn.com/v4/letter/b/919ad9/32.png) [@BuiltIntelligence](https://reachback.builtintelligence.com/u/BuiltIntelligence)\
**Post date:** [12 October 2012 17:57 UTC](https://reachback.builtintelligence.com/t/from-which-bodies-might-the-contractor-be-required-to-obtain-approval-for-his-designs/511/2 "2012-10-12T17:57:02Z")

</div>

The Contractor may be required to seek approval for his design from bodies such as: nuclear inspectorates; planning authorities; and Others who have the duty or authority to approve his design.