# Does an individual require planning permission to replace doors within a building?

**URL:** <https://reachback.builtintelligence.com/t/does-an-individual-require-planning-permission-to-replace-doors-within-a-building/2734>\
**Category:** Part A Structure\
**Created:** [14 February 2013 14:19 UTC](https://reachback.builtintelligence.com/t/does-an-individual-require-planning-permission-to-replace-doors-within-a-building/2734 "2013-02-14T14:19:04Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [14 February 2013 14:19 UTC](https://reachback.builtintelligence.com/t/does-an-individual-require-planning-permission-to-replace-doors-within-a-building/2734/1 "2013-02-14T14:19:04Z")

</div>



---

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [14 February 2013 14:19 UTC](https://reachback.builtintelligence.com/t/does-an-individual-require-planning-permission-to-replace-doors-within-a-building/2734/2 "2013-02-14T14:19:13Z")

</div>

Generally not, but planning permission is required should the building be listed or located within a Conservation Area.