# Do I need a separate drying room?

**URL:** <https://reachback.builtintelligence.com/t/do-i-need-a-separate-drying-room/1228>\
**Category:** General Construction\
**Created:** [13 January 2013 08:45 UTC](https://reachback.builtintelligence.com/t/do-i-need-a-separate-drying-room/1228 "2013-01-13T08:45:21Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [13 January 2013 08:45 UTC](https://reachback.builtintelligence.com/t/do-i-need-a-separate-drying-room/1228/1 "2013-01-13T08:45:21Z")

</div>



---

<div class="post-metadata">

**Author:** ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)\
**Post date:** [25 January 2013 10:53 UTC](https://reachback.builtintelligence.com/t/do-i-need-a-separate-drying-room/1228/2 "2013-01-25T10:53:30Z")

</div>

There should be an area for securely storing clothing and for drying wet items.