# Authority imposing conditions

**URL:** <https://reachback.builtintelligence.com/t/authority-imposing-conditions/22429>\
**Category:** Uncategorized\
**Created:** [25 July 2025 08:44 UTC](https://reachback.builtintelligence.com/t/authority-imposing-conditions/22429 "2025-07-25T08:44:00Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![InfraPM](https://avatars.discourse-cdn.com/v4/letter/i/3be4f8/32.png) [@InfraPM](https://reachback.builtintelligence.com/u/InfraPM)\
**Post date:** [25 July 2025 08:44 UTC](https://reachback.builtintelligence.com/t/authority-imposing-conditions/22429/1 "2025-07-25T08:44:00Z")

</div>

We are managing an NEC3 construction contract and the local authority are imposing conditions that restrict how the works must be delivered eg, working hours, noise levels etc. The works information contains general requirements for the Contractor to agree and comply with conditions imposed by the LA, however no specific limits or times etc.  
Is this an additional constraint to how the works must be delivered , a change to the works information under 60.1(5) or must be instructed by the PM under 60.1(1)?

---

<div class="post-metadata">

**Author:** ![dave\_bates](https://dub1.discourse-cdn.com/flex013/user_avatar/reachback.builtintelligence.com/dave_bates/32/55_2.png) [@dave\_bates](https://reachback.builtintelligence.com/u/dave_bates)\
**Post date:** [2 January 2026 11:00 UTC](https://reachback.builtintelligence.com/t/authority-imposing-conditions/22429/2 "2026-01-02T11:00:49Z")

</div>

If the Scope expressly states the Contractor is required to obtain and comply with the general requirements eg a Section 61, then there is no change to the Scope