# Are there published standard arbitration procedures?

**URL:** <https://reachback.builtintelligence.com/t/are-there-published-standard-arbitration-procedures/821>\
**Category:** NEC3 and NEC4 Contracts\
**Created:** [15 October 2012 18:38 UTC](https://reachback.builtintelligence.com/t/are-there-published-standard-arbitration-procedures/821 "2012-10-15T18:38:16Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![BuiltIntelligence](https://avatars.discourse-cdn.com/v4/letter/b/919ad9/32.png) [@BuiltIntelligence](https://reachback.builtintelligence.com/u/BuiltIntelligence)\
**Post date:** [15 October 2012 18:38 UTC](https://reachback.builtintelligence.com/t/are-there-published-standard-arbitration-procedures/821/1 "2012-10-15T18:38:16Z")

</div>

Are there published standard arbitration procedures?

---

<div class="post-metadata">

**Author:** ![BuiltIntelligence](https://avatars.discourse-cdn.com/v4/letter/b/919ad9/32.png) [@BuiltIntelligence](https://reachback.builtintelligence.com/u/BuiltIntelligence)\
**Post date:** [15 October 2012 18:38 UTC](https://reachback.builtintelligence.com/t/are-there-published-standard-arbitration-procedures/821/2 "2012-10-15T18:38:31Z")

</div>

In the UK, the Institution of Civil Engineers and the Joint Contracts Tribunal publish standard arbitration procedures. Arbitration procedures frequently used both inside and outside the UK are:

```
	Rules of Conciliation and Arbitration of the International Chamber of Commerce,

	United Nations sponsored UNCITRAL rules, and

	The ACP/EEC Conciliation and Arbitration Rules, covering contracts funded by the European Development Fund.
```