# Are there exemptions to the Construction (Head Protection) Regulations 1989 for specific religious groups?

**URL:** https://reachback.builtintelligence.com/t/are-there-exemptions-to-the-construction-head-protection-regulations-1989-for-specific-religious-groups/1135
**Category:** General Construction
**Created:** [13 January 2013 06:30 UTC](https://reachback.builtintelligence.com/t/are-there-exemptions-to-the-construction-head-protection-regulations-1989-for-specific-religious-groups/1135 "2013-01-13T06:30:55Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)
#### Post date: [13 January 2013 06:30 UTC](https://reachback.builtintelligence.com/t/are-there-exemptions-to-the-construction-head-protection-regulations-1989-for-specific-religious-groups/1135/1 "2013-01-13T06:30:55Z")

</div>



---

<div class="post-metadata">

### Author: ![HSE](https://avatars.discourse-cdn.com/v4/letter/h/e95f7d/32.png) [@HSE](https://reachback.builtintelligence.com/u/HSE)
#### Post date: [25 January 2013 12:25 UTC](https://reachback.builtintelligence.com/t/are-there-exemptions-to-the-construction-head-protection-regulations-1989-for-specific-religious-groups/1135/2 "2013-01-25T12:25:23Z")

</div>

Section 11(1) of the Employment Act 1989 exempts turban-wearing Sikhs from any legal requirement to wear a safety helmet while on a construction site. This exemption does not apply in workplaces other than construction sites. Further information can be found at [Appendix 4 of HSE’s free guidance on the Regulations](http://www.hse.gov.uk/pubns/books/l102.htm).

```
There are no such exemptions for other religious groups.
```
