# Are there any significant procedural differences between the various forms of British legislation that exist with regards to buildings regulations?

**URL:** <https://reachback.builtintelligence.com/t/are-there-any-significant-procedural-differences-between-the-various-forms-of-british-legislation-that-exist-with-regards-to-buildings-regulations/2376>\
**Category:** General\
**Created:** [6 February 2013 14:18 UTC](https://reachback.builtintelligence.com/t/are-there-any-significant-procedural-differences-between-the-various-forms-of-british-legislation-that-exist-with-regards-to-buildings-regulations/2376 "2013-02-06T14:18:36Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [6 February 2013 14:18 UTC](https://reachback.builtintelligence.com/t/are-there-any-significant-procedural-differences-between-the-various-forms-of-british-legislation-that-exist-with-regards-to-buildings-regulations/2376/1 "2013-02-06T14:18:36Z")

</div>



---

<div class="post-metadata">

**Author:** ![Build\_Regs\_Advisors](https://avatars.discourse-cdn.com/v4/letter/b/ee7513/32.png) [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Post date:** [6 February 2013 14:18 UTC](https://reachback.builtintelligence.com/t/are-there-any-significant-procedural-differences-between-the-various-forms-of-british-legislation-that-exist-with-regards-to-buildings-regulations/2376/2 "2013-02-06T14:18:45Z")

</div>

There are a few minor procedural differences, but the main variation between the Scottish and English legislation is that building warrants are required before work begins in Scotland.