# Planning and Architecture

**URL:** https://reachback.builtintelligence.com/c/planning-and-architecture/11.md

[Latest](https://reachback.builtintelligence.com/latest.md) · [Categories](https://reachback.builtintelligence.com/categories.md) · [Tags](https://reachback.builtintelligence.com/tags.md)

---

## [About the Planning and Architecture category](https://reachback.builtintelligence.com/t/about-the-planning-and-architecture-category/16)

<div class="topic-metadata">

**Author:** [@system](https://reachback.builtintelligence.com/u/system)\
**Replies:** 0\
**Last updated:** [27 February 2020 19:05 UTC](https://reachback.builtintelligence.com/t/about-the-planning-and-architecture-category/16 "2020-02-27T19:05:56Z")

</div>

This category is for planning and architecture related questions and discussion.

---

## [Is there a simple risk assessment form available for use by surveyors undertaking surveys in domestic properties?](https://reachback.builtintelligence.com/t/is-there-a-simple-risk-assessment-form-available-for-use-by-surveyors-undertaking-surveys-in-domestic-properties/3700)

<div class="topic-metadata">

**Author:** [@system](https://reachback.builtintelligence.com/u/system)\
**Replies:** 2\
**Last updated:** [18 May 2020 17:04 UTC](https://reachback.builtintelligence.com/t/is-there-a-simple-risk-assessment-form-available-for-use-by-surveyors-undertaking-surveys-in-domestic-properties/3700 "2020-05-18T17:04:41Z")

</div>

---

## [Planning: Can a building with a COI be demolished without any planning application as to its use afterwards](https://reachback.builtintelligence.com/t/planning-can-a-building-with-a-coi-be-demolished-without-any-planning-application-as-to-its-use-afterwards/4619)

<div class="topic-metadata">

**Author:** [@Mack](https://reachback.builtintelligence.com/u/Mack)\
**Replies:** 1\
**Last updated:** [9 August 2018 15:09 UTC](https://reachback.builtintelligence.com/t/planning-can-a-building-with-a-coi-be-demolished-without-any-planning-application-as-to-its-use-afterwards/4619 "2018-08-09T15:09:13Z")

</div>

Littlebrook Power Station and chimney have a COI and the owners have obtained a demolition order. No planning application has been made for its redevelopment but the company have indicated their intentions which once t…

---

## [Do you pay VAT on a Cleud application?](https://reachback.builtintelligence.com/t/do-you-pay-vat-on-a-cleud-application/3510)

<div class="topic-metadata">

**Author:** [@system](https://reachback.builtintelligence.com/u/system)\
**Replies:** 1\
**Last updated:** [19 October 2015 11:42 UTC](https://reachback.builtintelligence.com/t/do-you-pay-vat-on-a-cleud-application/3510 "2015-10-19T11:42:01Z")

</div>

---

## [What is the regulation for minimum spacing of bars of a walk-on grille over a light well (domestic situation)](https://reachback.builtintelligence.com/t/what-is-the-regulation-for-minimum-spacing-of-bars-of-a-walk-on-grille-over-a-light-well-domestic-situation/3070)

<div class="topic-metadata">

**Author:** [@system](https://reachback.builtintelligence.com/u/system)\
**Replies:** 4\
**Last updated:** [7 June 2013 15:05 UTC](https://reachback.builtintelligence.com/t/what-is-the-regulation-for-minimum-spacing-of-bars-of-a-walk-on-grille-over-a-light-well-domestic-situation/3070 "2013-06-07T15:05:23Z")

</div>

.My thought is that the 100mm as for railings etc applies but this seems too large to comfortably walk on.

---

## [With regard to the existing Building Regulations, what is the most recent and applicable legislation and guidance available with regard to disabled access to a building?](https://reachback.builtintelligence.com/t/with-regard-to-the-existing-building-regulations-what-is-the-most-recent-and-applicable-legislation-and-guidance-available-with-regard-to-disabled-access-to-a-building/2857)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:47 UTC](https://reachback.builtintelligence.com/t/with-regard-to-the-existing-building-regulations-what-is-the-most-recent-and-applicable-legislation-and-guidance-available-with-regard-to-disabled-access-to-a-building/2857 "2013-02-15T13:47:38Z")

</div>

---

## [With regard to the existing Building Regulations, should buildings that are used for industrial or commercial purposes that also contain living accommodation be legally treated as a dwelling?](https://reachback.builtintelligence.com/t/with-regard-to-the-existing-building-regulations-should-buildings-that-are-used-for-industrial-or-commercial-purposes-that-also-contain-living-accommodation-be-legally-treated-as-a-dwelling/2856)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:47 UTC](https://reachback.builtintelligence.com/t/with-regard-to-the-existing-building-regulations-should-buildings-that-are-used-for-industrial-or-commercial-purposes-that-also-contain-living-accommodation-be-legally-treated-as-a-dwelling/2856 "2013-02-15T13:47:10Z")

</div>

---

## [With regard to Building Regulations and legislation, is there any officially improved legislation or guidance with regard to domestic heating?](https://reachback.builtintelligence.com/t/with-regard-to-building-regulations-and-legislation-is-there-any-officially-improved-legislation-or-guidance-with-regard-to-domestic-heating/2855)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:46 UTC](https://reachback.builtintelligence.com/t/with-regard-to-building-regulations-and-legislation-is-there-any-officially-improved-legislation-or-guidance-with-regard-to-domestic-heating/2855 "2013-02-15T13:46:46Z")

</div>

---

## [With regard to Building Regulations and legislation, are there any official documents that deal with the prevention of overheating caused by solar gains in summer?](https://reachback.builtintelligence.com/t/with-regard-to-building-regulations-and-legislation-are-there-any-official-documents-that-deal-with-the-prevention-of-overheating-caused-by-solar-gains-in-summer/2854)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:46 UTC](https://reachback.builtintelligence.com/t/with-regard-to-building-regulations-and-legislation-are-there-any-official-documents-that-deal-with-the-prevention-of-overheating-caused-by-solar-gains-in-summer/2854 "2013-02-15T13:46:16Z")

</div>

---

## [With regards to the existing Building Regulations, should a block of flats be treated as a separate development irrespective of the number of blocks on the site?](https://reachback.builtintelligence.com/t/with-regards-to-the-existing-building-regulations-should-a-block-of-flats-be-treated-as-a-separate-development-irrespective-of-the-number-of-blocks-on-the-site/2853)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:45 UTC](https://reachback.builtintelligence.com/t/with-regards-to-the-existing-building-regulations-should-a-block-of-flats-be-treated-as-a-separate-development-irrespective-of-the-number-of-blocks-on-the-site/2853 "2013-02-15T13:45:17Z")

</div>

---

## [Which documentation deals with the procedures related to working on historic buildings?](https://reachback.builtintelligence.com/t/which-documentation-deals-with-the-procedures-related-to-working-on-historic-buildings/2852)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:44 UTC](https://reachback.builtintelligence.com/t/which-documentation-deals-with-the-procedures-related-to-working-on-historic-buildings/2852 "2013-02-15T13:44:53Z")

</div>

---

## [Which specific Building Regulations deal with the legal procedures related to sound insulation testing?](https://reachback.builtintelligence.com/t/which-specific-building-regulations-deal-with-the-legal-procedures-related-to-sound-insulation-testing/2851)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:44 UTC](https://reachback.builtintelligence.com/t/which-specific-building-regulations-deal-with-the-legal-procedures-related-to-sound-insulation-testing/2851 "2013-02-15T13:44:36Z")

</div>

---

## [If a person(s) who is not registered to self-certify intends to carry out any form of electrical installation, what procedure needs to be followed?](https://reachback.builtintelligence.com/t/if-a-person-s-who-is-not-registered-to-self-certify-intends-to-carry-out-any-form-of-electrical-installation-what-procedure-needs-to-be-followed/2850)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:44 UTC](https://reachback.builtintelligence.com/t/if-a-person-s-who-is-not-registered-to-self-certify-intends-to-carry-out-any-form-of-electrical-installation-what-procedure-needs-to-be-followed/2850 "2013-02-15T13:44:03Z")

</div>

---

## [If an individual has completed some electrical work, and is unsure whether or not it falls under the remit of work that needs to be certified, what is the appropriate procedure?](https://reachback.builtintelligence.com/t/if-an-individual-has-completed-some-electrical-work-and-is-unsure-whether-or-not-it-falls-under-the-remit-of-work-that-needs-to-be-certified-what-is-the-appropriate-procedure/2849)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:43 UTC](https://reachback.builtintelligence.com/t/if-an-individual-has-completed-some-electrical-work-and-is-unsure-whether-or-not-it-falls-under-the-remit-of-work-that-needs-to-be-certified-what-is-the-appropriate-procedure/2849 "2013-02-15T13:43:40Z")

</div>

---

## [With regard to the existing Building Regulations, what is stated regarding alternative escape routes with regard to fire?](https://reachback.builtintelligence.com/t/with-regard-to-the-existing-building-regulations-what-is-stated-regarding-alternative-escape-routes-with-regard-to-fire/2848)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:43 UTC](https://reachback.builtintelligence.com/t/with-regard-to-the-existing-building-regulations-what-is-stated-regarding-alternative-escape-routes-with-regard-to-fire/2848 "2013-02-15T13:43:13Z")

</div>

---

## [If a balcony or flat is provided within a building in order for people to escape from fire then are there any specific safety requirements under the existing Building Regulations?](https://reachback.builtintelligence.com/t/if-a-balcony-or-flat-is-provided-within-a-building-in-order-for-people-to-escape-from-fire-then-are-there-any-specific-safety-requirements-under-the-existing-building-regulations/2847)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:42 UTC](https://reachback.builtintelligence.com/t/if-a-balcony-or-flat-is-provided-within-a-building-in-order-for-people-to-escape-from-fire-then-are-there-any-specific-safety-requirements-under-the-existing-building-regulations/2847 "2013-02-15T13:42:24Z")

</div>

---

## [According to existing Building Regulation, where should self-closing fire doors be positioned within a building?](https://reachback.builtintelligence.com/t/according-to-existing-building-regulation-where-should-self-closing-fire-doors-be-positioned-within-a-building/2846)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:42 UTC](https://reachback.builtintelligence.com/t/according-to-existing-building-regulation-where-should-self-closing-fire-doors-be-positioned-within-a-building/2846 "2013-02-15T13:42:00Z")

</div>

---

## [Where can one obtain more information regarding Building Regulations with regard to electrical installation?](https://reachback.builtintelligence.com/t/where-can-one-obtain-more-information-regarding-building-regulations-with-regard-to-electrical-installation/2845)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:41 UTC](https://reachback.builtintelligence.com/t/where-can-one-obtain-more-information-regarding-building-regulations-with-regard-to-electrical-installation/2845 "2013-02-15T13:41:34Z")

</div>

---

## [Under the existing Building Regulations, what needs to be included within the records of the installation?](https://reachback.builtintelligence.com/t/under-the-existing-building-regulations-what-needs-to-be-included-within-the-records-of-the-installation/2844)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:41 UTC](https://reachback.builtintelligence.com/t/under-the-existing-building-regulations-what-needs-to-be-included-within-the-records-of-the-installation/2844 "2013-02-15T13:41:00Z")

</div>

---

## [Under the existing Building Regulations, do inspections and tests will have to be completed and recorded with regard to electrical installations?](https://reachback.builtintelligence.com/t/under-the-existing-building-regulations-do-inspections-and-tests-will-have-to-be-completed-and-recorded-with-regard-to-electrical-installations/2843)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:40 UTC](https://reachback.builtintelligence.com/t/under-the-existing-building-regulations-do-inspections-and-tests-will-have-to-be-completed-and-recorded-with-regard-to-electrical-installations/2843 "2013-02-15T13:40:35Z")

</div>

---

## [Is there any sort of electrical work that can be carried out by a non-competent person, and for which the local authority does not need to be contacted?](https://reachback.builtintelligence.com/t/is-there-any-sort-of-electrical-work-that-can-be-carried-out-by-a-non-competent-person-and-for-which-the-local-authority-does-not-need-to-be-contacted/2842)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:40 UTC](https://reachback.builtintelligence.com/t/is-there-any-sort-of-electrical-work-that-can-be-carried-out-by-a-non-competent-person-and-for-which-the-local-authority-does-not-need-to-be-contacted/2842 "2013-02-15T13:40:10Z")

</div>

---

## [Is it necessary to inform a local authority Building Control Body before carrying out electrical installation work?](https://reachback.builtintelligence.com/t/is-it-necessary-to-inform-a-local-authority-building-control-body-before-carrying-out-electrical-installation-work/2841)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:39 UTC](https://reachback.builtintelligence.com/t/is-it-necessary-to-inform-a-local-authority-building-control-body-before-carrying-out-electrical-installation-work/2841 "2013-02-15T13:39:42Z")

</div>

---

## [Are there any legal consequences to carrying out electrical work when not registered as a competent person?](https://reachback.builtintelligence.com/t/are-there-any-legal-consequences-to-carrying-out-electrical-work-when-not-registered-as-a-competent-person/2840)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:39 UTC](https://reachback.builtintelligence.com/t/are-there-any-legal-consequences-to-carrying-out-electrical-work-when-not-registered-as-a-competent-person/2840 "2013-02-15T13:39:20Z")

</div>

---

## [What are the relevant schemes for competent persons, under which qualified electricians may register?](https://reachback.builtintelligence.com/t/what-are-the-relevant-schemes-for-competent-persons-under-which-qualified-electricians-may-register/2839)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:39 UTC](https://reachback.builtintelligence.com/t/what-are-the-relevant-schemes-for-competent-persons-under-which-qualified-electricians-may-register/2839 "2013-02-15T13:39:00Z")

</div>

---

## [Within the existing Building Regulation, what person(s) are entitled to self-certify an installation?](https://reachback.builtintelligence.com/t/within-the-existing-building-regulation-what-person-s-are-entitled-to-self-certify-an-installation/2838)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:38 UTC](https://reachback.builtintelligence.com/t/within-the-existing-building-regulation-what-person-s-are-entitled-to-self-certify-an-installation/2838 "2013-02-15T13:38:35Z")

</div>

---

## [What duties is a competent person responsible for with regards to electrical installation under the existing Building Regulations?](https://reachback.builtintelligence.com/t/what-duties-is-a-competent-person-responsible-for-with-regards-to-electrical-installation-under-the-existing-building-regulations/2837)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:37 UTC](https://reachback.builtintelligence.com/t/what-duties-is-a-competent-person-responsible-for-with-regards-to-electrical-installation-under-the-existing-building-regulations/2837 "2013-02-15T13:37:32Z")

</div>

---

## [With regards to the existing Building Regulations, how is a 'competent firm' that is to deal with electrical work defined?](https://reachback.builtintelligence.com/t/with-regards-to-the-existing-building-regulations-how-is-a-competent-firm-that-is-to-deal-with-electrical-work-defined/2836)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:37 UTC](https://reachback.builtintelligence.com/t/with-regards-to-the-existing-building-regulations-how-is-a-competent-firm-that-is-to-deal-with-electrical-work-defined/2836 "2013-02-15T13:37:02Z")

</div>

---

## [With regards to the existing Building Regulations, what types of building does Approved Document P cover?](https://reachback.builtintelligence.com/t/with-regards-to-the-existing-building-regulations-what-types-of-building-does-approved-document-p-cover/2835)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:36 UTC](https://reachback.builtintelligence.com/t/with-regards-to-the-existing-building-regulations-what-types-of-building-does-approved-document-p-cover/2835 "2013-02-15T13:36:22Z")

</div>

---

## [What is the procedure with regard to having electrical work undertaken in one's home that involves the addition of a new electrical circuit?](https://reachback.builtintelligence.com/t/what-is-the-procedure-with-regard-to-having-electrical-work-undertaken-in-ones-home-that-involves-the-addition-of-a-new-electrical-circuit/2834)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:35 UTC](https://reachback.builtintelligence.com/t/what-is-the-procedure-with-regard-to-having-electrical-work-undertaken-in-ones-home-that-involves-the-addition-of-a-new-electrical-circuit/2834 "2013-02-15T13:35:53Z")

</div>

---

## [What are the statutory requirements under existing Building Regulations with regard to electrical installations?](https://reachback.builtintelligence.com/t/what-are-the-statutory-requirements-under-existing-building-regulations-with-regard-to-electrical-installations/2833)

<div class="topic-metadata">

**Author:** [@Build\_Regs\_Advisors](https://reachback.builtintelligence.com/u/Build_Regs_Advisors)\
**Replies:** 1\
**Last updated:** [15 February 2013 13:35 UTC](https://reachback.builtintelligence.com/t/what-are-the-statutory-requirements-under-existing-building-regulations-with-regard-to-electrical-installations/2833 "2013-02-15T13:35:24Z")

</div>

[Next page](https://reachback.builtintelligence.com/c/planning-and-architecture/11.md?page=1)
