## [Release Notes up to 2025-08-03 Contract Management Sprint 121](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-08-03-contract-management-sprint-121/22447)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [5 August 2025 12:10 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-08-03-contract-management-sprint-121/22447 "2025-08-05T12:10:08Z")

</div>

This release contains new features, several improvements and bug fixes. \* New + Improved \* New Features Bulk import of contract users. This is only available to System Owner and System Administrator. New Global Res…

---

## [Release Notes up to 2025-07-20 Contract Management Sprint 120](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-07-20-contract-management-sprint-120/22423)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [22 July 2025 15:10 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-07-20-contract-management-sprint-120/22423 "2025-07-22T15:10:10Z")

</div>

This release contains a couple of improvements and some bug fixes. \* New + Improved \* New Features Bulk import of projects is now available to users who are System Owner and System or Site Administrator. A Supplier Pro…

---

## [Release Notes up to 2025-07-06 Contract Management Sprint 119](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-07-06-contract-management-sprint-119/22394)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [8 July 2025 10:24 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-07-06-contract-management-sprint-119/22394 "2025-07-08T10:24:27Z")

</div>

This release contains a couple of improvements and some bug fixes. \* New + Improved \* Improvements We have made the following improvements to our Admin functions Added validation to the template editor to prevent Ear…

---

## [Release Notes upto 2025-06-27 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-06-27-academy/22378)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [27 June 2025 11:12 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-06-27-academy/22378 "2025-06-27T11:12:04Z")

</div>

New Webinars/Events Discount or Bonus? Understanding Retentions in the UK Construction Industry Control of the Quality Under JCT D&B Contract FastDraft Early Warning Masterclass What to do when things go wrong on an ECS…

---

## [Release Notes up to 2025-06-21 Contract Management Sprint 118](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-06-21-contract-management-sprint-118/22370)

<div class="topic-metadata">

**Author:** [@LilyPage](https://reachback.builtintelligence.com/u/LilyPage)\
**Replies:** 0\
**Last updated:** [23 June 2025 10:54 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-06-21-contract-management-sprint-118/22370 "2025-06-23T10:54:30Z")

</div>

Bug fixes We have corrected the following; Correction to Reminders panel, to allow the other party to open communicated notices instead of receiving ‘no actions’ message.

---

## [Release Notes up to 2025-06-07 Contract Management Sprint 117](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-06-07-contract-management-sprint-117/22350)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [10 June 2025 08:16 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-06-07-contract-management-sprint-117/22350 "2025-06-10T08:16:02Z")

</div>

This release contains a couple of improvements and some bug fixes. \* New + Improved \* New We have added new configurable reply capability to the following workflows. Improved handling of document uploads to avoid UI p…

---

## [Release Notes upto 2025-05-29 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-05-29-academy/22323)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [29 May 2025 08:56 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-05-29-academy/22323 "2025-05-29T08:56:14Z")

</div>

New Webinars/Events Building High Performing Teams Overview of Partial Possession and Practical Completion under JCT D&B Contract Handy Tips and Tools to Help PMs and Civil Engineers Keep Control of Project Costs An Int…

---

## [Release Notes up to 2025-05-24 Contract Management Sprint 116](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-05-24-contract-management-sprint-116/22318)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [27 May 2025 09:37 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-05-24-contract-management-sprint-116/22318 "2025-05-27T09:37:04Z")

</div>

New + Improved New We have added new configurable reply capability to the following workflows. Site Diary notifications, indicating whether to accept or not accept the supplier’s Site Diary notice so there is a record …

---

## [Release Notes up to 2025-05-10 Contract Management Sprint 115](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-05-10-contract-management-sprint-115/22292)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [13 May 2025 09:28 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-05-10-contract-management-sprint-115/22292 "2025-05-13T09:28:16Z")

</div>

This release contains a couple of improvements and some bug fixes. \* New + Improved \* New CE and Quote extensions now also work with the new Actions register and the To Do List side-panel Reporting API now allows users…

---

## [Release Notes up to 2025-04-26 Contract Management Sprint 114](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-04-26-contract-management-sprint-114/22271)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [29 April 2025 09:35 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-04-26-contract-management-sprint-114/22271 "2025-04-29T09:35:45Z")

</div>

This release contains a couple of improvements and a bug fix. \* Improvements We have enabled the functionality for Company Administrators to be able to switch roles on a contract. Users on our managed platform are now …

---

## [Release Notes up to 2025-04-14 Contract Management Sprint 113](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-04-14-contract-management-sprint-113/22249)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [15 April 2025 09:22 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-04-14-contract-management-sprint-113/22249 "2025-04-15T09:22:02Z")

</div>

This release contains a couple of improvements and some bug fixes. \* New + Improved \* New We have added new optional filters to reporting API to support the new Actions reports. \* Improvements We have moved Task Order …

---

## [Release Notes up to 2025-03-29 Contract Management Sprint 112](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-03-29-contract-management-sprint-112/22223)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [31 March 2025 11:30 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-03-29-contract-management-sprint-112/22223 "2025-03-31T11:30:21Z")

</div>

This release contains a couple of improvements. The next release will be our first Quarterly one, introducing some new features. \* New + Improved \* Improvements On contracts where contract level limits are enabled, th…

---

## [Release Notes upto 2025-03-31 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-03-31-academy/22220)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [31 March 2025 10:39 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-03-31-academy/22220 "2025-03-31T10:39:50Z")

</div>

New Webinars/Events Default and Termination Procedures under JCT D&B Less Noise, More Signal The Notice Provisions in the JCT Contracts Default, Repudiation, Insolvency and Termination Under JCT D&B An Overview of Risk…

---

## [Release Notes up to 2025-03-15 Contract Management Sprint 111](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-03-15-contract-management-sprint-111/22186)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [17 March 2025 14:57 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-03-15-contract-management-sprint-111/22186 "2025-03-17T14:57:17Z")

</div>

This release contains a few new features, improvements and bug fixes. We are also working on new larger features that will be announced in the coming months. \* New + Improved \* New Bulk Import We have added functionalit…

---

## [Release Notes up to 2025-03-01 Contract Management Sprint 110](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-03-01-contract-management-sprint-110/22159)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [3 March 2025 11:20 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-03-01-contract-management-sprint-110/22159 "2025-03-03T11:20:08Z")

</div>

This release contains a few new features, improvements and bug fixes. We are also working on new larger features that will be announced in the coming months. \* New + Improved \* New hyperlinks We now added hyperlinks fro…

---

## [Release Notes upto 2025-02-26 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-02-26-academy/22150)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [26 February 2025 15:45 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-02-26-academy/22150 "2025-02-26T15:45:21Z")

</div>

New Webinars/Events Overview of Payment Provisions under JCT D&B Contract - Timing and amounts due Payment and the Construction Act An Overview of the FIDIC Red Book Understanding What Sums Properly Due JCT Design & Bu…

---

## [Release Notes up to 2025-02-01 Contract Management Sprint 106 107 108](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-02-01-contract-management-sprint-106-107-108/22105)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [3 February 2025 14:27 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-02-01-contract-management-sprint-106-107-108/22105 "2025-02-03T14:27:16Z")

</div>

This release contains a few improvements and bug fixes. We are also working on new features that will be announced in the coming months. \* New + Improved \* New Relationship chain We have introduced the capability to vie…

---

## [Release Notes up to 2025-02-15 Contract Management Sprint 109](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-02-15-contract-management-sprint-109/22122)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [17 February 2025 12:41 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-02-15-contract-management-sprint-109/22122 "2025-02-17T12:41:41Z")

</div>

This release contains a few new features, improvements and bug fixes. We are also working on new larger features that will be announced in the coming months. \* New + Improved \* New Bulk Import We now have the ability, f…

---

## [Release Notes upto 2025-01-29 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-01-29-academy/22097)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [29 January 2025 10:20 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-01-29-academy/22097 "2025-01-29T10:20:52Z")

</div>

New Webinars/Events Contractual Entitlements (Part 1-6) 1-Day Session Control of the Works Under JCT D&B Contract for Design Submissions and Employer’s Instructions Design and Build Contracts: An overview of the JCT an…

---

## [Release Notes up to 2024-12-21 Contract Management Sprint 105](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-12-21-contract-management-sprint-105/22059)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [2 January 2025 15:27 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-12-21-contract-management-sprint-105/22059 "2025-01-02T15:27:42Z")

</div>

This release contains a few improvements and bug fixes. We are also working on new features that will be announced in the coming months. New + Improved Improved Add User to Multiple Contracts functionality We have impro…

---

## [Release Notes upto 2024-12-18 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2024-12-18-academy/22048)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [18 December 2024 15:33 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2024-12-18-academy/22048 "2024-12-18T15:33:03Z")

</div>

New Webinars/Events Overview of Partial Possession and Practical Completion under JCT D&B Contract An Introduction to the Extensions of Time Provisions under JCT D&B Contract NEC4 ECC Disallowed Cost Impact of Sustaina…

---

## [Release Notes up to 2024-12-07 Contract Management Sprint 104](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-12-07-contract-management-sprint-104/22037)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [9 December 2024 12:45 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-12-07-contract-management-sprint-104/22037 "2024-12-09T12:45:07Z")

</div>

This release contains a few improvements and bug fixes. We are also working on new features that will be announced in the coming months. New + Improved Improved contract set up validation We have added extra validation …

---

## [Release Notes upto 2024-11-27 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2024-11-27-academy/22019)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [27 November 2024 10:44 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2024-11-27-academy/22019 "2024-11-27T10:44:52Z")

</div>

New Webinars/Events NEC4 ECS (Part 1 - 6) 1-Day Session Understanding Key Documents of a JCT Design and Build Contract Building High Performing Teams Handy Tips and Tools to Help PMs and Civil Engineers Keep Control of…

---

## [Release Notes up to 2024-11-23 Contract Management Sprint 103](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-11-23-contract-management-sprint-103/22018)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [26 November 2024 16:08 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-11-23-contract-management-sprint-103/22018 "2024-11-26T16:08:18Z")

</div>

This release contains a few improvements and bug fixes. We are also working on new features that will be announced in the coming months. New + Improved Improved validation on contract changes We have added validation wh…

---

## [Release Notes up to 2024-11-09 Contract Management Sprint 102](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-11-09-contract-management-sprint-102/21998)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [12 November 2024 16:43 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-11-09-contract-management-sprint-102/21998 "2024-11-12T16:43:06Z")

</div>

Improvements We have made improvements to the following; Add the capability to export the secondary dates registers. Add the capability to export the secondary prices registers Where enabled, there is a register of se…

---

## [Release Notes upto 2024-10-30 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2024-10-30-academy/21982)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 2\
**Last updated:** [30 October 2024 10:48 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2024-10-30-academy/21982 "2024-10-30T10:48:43Z")

</div>

New Webinars/Events NEC4 TSC (Part 1 - 6) 1-Day Session Indemnity and insurance under JCT D&B - Public liability, and works insurance NEC3 ECC (Part 1 - 6) 1-Day Session Adjudication in the Construction and Engineering…

---

## [Release Notes up to 2024-10-26 Contract Management Sprint 101](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-10-26-contract-management-sprint-101/21979)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [29 October 2024 12:59 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-10-26-contract-management-sprint-101/21979 "2024-10-29T12:59:56Z")

</div>

These releases contain any new features, improvements and bug fixes worked on for this quarter and period. New Features The below are new features that are available to all our customers. If you would like any of these …

---

## [Release Notes up to 2024-10-12 Contract Management Sprint 100](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-10-12-contract-management-sprint-100/21962)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [14 October 2024 13:48 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-10-12-contract-management-sprint-100/21962 "2024-10-14T13:48:55Z")

</div>

This release contains a small tweak and a couple of bug fixes for this period as we continue to work on the new features for our Quarter 3 implementation due in two weeks. New + Improved Improved Report naming ^^ We hav…

---

## [Release Notes upto 2024-09-30 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2024-09-30-academy/21934)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [2 October 2024 08:34 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2024-09-30-academy/21934 "2024-10-02T08:34:47Z")

</div>

New Webinars/Events An Overview of Risk Management (Part 1) An Overview of Risk Management (Part 2) Overview of Payment Provisions under JCT D&B Contract - Listed items and deductions The Notice Provisions in the JCT C…

---

## [Release Notes up to 2024-09-28 Contract Management Sprint 98/99](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-09-28-contract-management-sprint-98-99/21933)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [1 October 2024 15:57 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2024-09-28-contract-management-sprint-98-99/21933 "2024-10-01T15:57:00Z")

</div>

This release contains any general fixes and small tweaks for this period as we continue to work on new features for our Quarter 3 implementation due next release. New + Improved Improved Response Required Date If a Resp…