# Product Release Notes

**URL:** https://reachback.builtintelligence.com/c/built-intelligence-roadmap/released/84.md

[Latest](https://reachback.builtintelligence.com/latest.md) · [Categories](https://reachback.builtintelligence.com/categories.md) · [Tags](https://reachback.builtintelligence.com/tags.md)

---

## [About the Product Release Notes category](https://reachback.builtintelligence.com/t/about-the-product-release-notes-category/7159)

<div class="topic-metadata">

**Author:** [@chriscorr](https://reachback.builtintelligence.com/u/chriscorr)\
**Replies:** 0

</div>

This category is about the product updates we release for our course content, platform features and events.

---

## [Release Notes up to 2026-09-26 Contract Management Sprint 151](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-09-26-contract-management-sprint-151/22670)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [29 September 2026 10:33 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-09-26-contract-management-sprint-151/22670 "2026-09-29T10:33:22Z")

</div>

This release contains the following Improvements and Bug fixes. \*Improvements We have added 2 new global resources (ITQ\_ASSESS\_DURATION and RFQ\_ASSESS\_DURATION) along with associated Actions. This will affect the due d…

---

## [Release Notes up to 2026-09-12 Contract Management Sprint 150](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-09-12-contract-management-sprint-150/22668)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [16 September 2026 13:52 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-09-12-contract-management-sprint-150/22668 "2026-09-16T13:52:58Z")

</div>

This release contains the following Improvements and Bug fixes. \*Improvements We have added Task/Project Order price (original and current) to Secondary Prices table We have also added Task/Project Order Price impacts …

---

## [Release Notes up to 2026-08-29 Contract Management Sprint 149](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-08-29-contract-management-sprint-149/22665)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [8 September 2026 11:17 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-08-29-contract-management-sprint-149/22665 "2026-09-08T11:17:51Z")

</div>

This release contains the following New features, Improvements and Bug fixes. \*New Features The below were all customer requests that we have developed: Add Type to the Task Order and Project Order workflow groups to …

---

## [Release Notes up to 2026-08-15 Contract Management Sprint 148](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-08-15-contract-management-sprint-148/22661)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [17 August 2026 10:59 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-08-15-contract-management-sprint-148/22661 "2026-08-17T10:59:17Z")

</div>

This release contains the following improvements and Bug fixes. \*Improvements Retain supported formatting when pasting formatted text into a long text field. A number of users had reported frustration that text copied …

---

## [Release Notes up to 2026-08-01 Contract Management Sprint 147](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-08-01-contract-management-sprint-147/22659)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [4 August 2026 10:14 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-08-01-contract-management-sprint-147/22659 "2026-08-04T10:14:19Z")

</div>

This release contains the following updates. \*Improvements Chatbot users will now be able to view their chat history and resume a previous conversation \*Bug Fixes Duplicated IDs were generated when submitting API req…

---

## [Release Notes up to 2026-07-18 Contract Management Sprint 146](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-07-18-contract-management-sprint-146/22658)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [22 July 2026 13:18 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-07-18-contract-management-sprint-146/22658 "2026-07-22T13:18:20Z")

</div>

This release contains improvements and bug fixes. \*Improvements Improved error name required - When attempting to copy a notice to a contract where the user is not a contract user - display a meaningful error message. E…

---

## [Release Notes up to 2026-07-04 Contract Management Sprint 145](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-07-04-contract-management-sprint-145/22648)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [7 July 2026 13:59 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-07-04-contract-management-sprint-145/22648 "2026-07-07T13:59:32Z")

</div>

This release is our Q2 release and contains contains an new features, improvements and bug fixes. \*New features These have been implemented and are now available to be switched on by request. Create draft notices via …

---

## [Release Notes up to 2026-06-20 Contract Management Sprint 144](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-06-20-contract-management-sprint-144/22641)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [23 June 2026 10:09 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-06-20-contract-management-sprint-144/22641 "2026-06-23T10:09:08Z")

</div>

This release contains an improvement and bug fix. \*Improvements Format links as hyperlinks in FastDraft email notifications \*Bug Fixes Cannot assign Project Order Generic Drafts copied to new instance

---

## [Release Notes up to 2026-06-06 Contract Management Sprint 143](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-06-06-contract-management-sprint-143/22638)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [9 June 2026 08:38 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-06-06-contract-management-sprint-143/22638 "2026-06-09T08:38:34Z")

</div>

This release contains an improvement and bug fix. \*Improvements Workflow 85 \[Variation Order\] added to the CompensationEventAssessment\_ProjectManager aggregate report \*Bug Fixes In some instances, file links in Globa…

---

## [Release Notes up to 2026-05-23 Contract Management Sprint 142](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-05-23-contract-management-sprint-142/22634)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [27 May 2026 13:17 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-05-23-contract-management-sprint-142/22634 "2026-05-27T13:17:04Z")

</div>

This release contains new features, improvements and bug fixes. \*New features There is new functionality to schedule an aggregate report to be run Daily/Weekly/Monthly so that reporting can be managed more efficiently …

---

## [Release Notes up to 2026-05-09 Contract Management Sprint 140 and 141](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-05-09-contract-management-sprint-140-and-141/22630)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [12 May 2026 09:25 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-05-09-contract-management-sprint-140-and-141/22630 "2026-05-12T09:25:32Z")

</div>

This release contains bug fixes and improvements. \*Bug Fixes Print preview of RAG Report and Health Check Report was showing as greyed out \*Improvements Enhanced draft properties for Aggregate reports - Following up …

---

## [Release Notes up to 2026-04-11 Contract Management Sprint 139](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-04-11-contract-management-sprint-139/22619)

<div class="topic-metadata">

**Author:** [@LilyPage](https://reachback.builtintelligence.com/u/LilyPage)\
**Replies:** 0\
**Last updated:** [13 April 2026 15:50 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-04-11-contract-management-sprint-139/22619 "2026-04-13T15:50:13Z")

</div>

This release contains bug fixes, improvements, and new features. \*Bug Fixes On submission of an interim quote no Action is being created to remind the supplier to submit another quote Account listed twice in system…

---

## [Release Notes up to 2026-03-28 Contract Management Sprint 138](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-03-28-contract-management-sprint-138/22614)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [1 April 2026 15:49 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-03-28-contract-management-sprint-138/22614 "2026-04-01T15:49:25Z")

</div>

This release contains new features, improvements and bug fixes. \*New Features We have added Project Company name to the Contracts Register We have added configurable options to require an attachment in the Programme su…

---

## [Release Notes up to 2026-03-14 Contract Management Sprint 137](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-03-14-contract-management-sprint-137/22609)

<div class="topic-metadata">

**Author:** [@LilyPage](https://reachback.builtintelligence.com/u/LilyPage)\
**Replies:** 0\
**Last updated:** [19 March 2026 13:12 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-03-14-contract-management-sprint-137/22609 "2026-03-19T13:12:18Z")

</div>

\*Bug Fixes Updated validation will allow Site Admins to edit a logo providing the company or any of its users has not been added to a contract (to avoid the risk of the logo being edited after notices have been sent wi…

---

## [Release Notes up to 2026-02-28 Contract Management Sprint 136](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-02-28-contract-management-sprint-136/22601)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [4 March 2026 11:38 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-02-28-contract-management-sprint-136/22601 "2026-03-04T11:38:16Z")

</div>

This release contains improvements and bug fixes. \*Improvements We have added Lead User Count (count of active/completed contracts on which a user ID appears in the Contract Overview) in the Manage System Users page an…

---

## [Release Notes up to 2026-01-31 Contract Management Sprint 134 & 135](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-01-31-contract-management-sprint-134-135/22587)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [3 February 2026 15:50 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-01-31-contract-management-sprint-134-135/22587 "2026-02-03T15:50:51Z")

</div>

This release only contains Bug Fixes: Dutch language for Calendar in Dashboard Design - This fixes a cosmetic issue whereby the calendar shown in the designer page is displayed in Dutch. This doesn’t affect the impleme…

---

## [Release Notes up to 2026-01-17 Contract Management Sprint 131 132 133](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-01-17-contract-management-sprint-131-132-133/22576)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [20 January 2026 17:00 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2026-01-17-contract-management-sprint-131-132-133/22576 "2026-01-20T17:00:38Z")

</div>

This release contains improvements and bug fixes. \*New and Improved \*Improvements Allow Admins to add/update/remove comments on the contract user table (eg explaining reason for access). These can also be viewed on the…

---

## [Release Notes up to 2025-12-06 Contract Management Sprint 130](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-12-06-contract-management-sprint-130/22556)

<div class="topic-metadata">

**Author:** [@LilyPage](https://reachback.builtintelligence.com/u/LilyPage)\
**Replies:** 0\
**Last updated:** [8 December 2025 14:31 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-12-06-contract-management-sprint-130/22556 "2025-12-08T14:31:15Z")

</div>

This release contains bug fixes and improvements. \* Bug fixes Custom fields becoming lowercase, and removes the word “from” Company Administrators can’t view a user record after it’s been deactivated or deleted T…

---

## [Release Notes upto 2025-11-28 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-11-28-academy/22550)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [28 November 2025 09:57 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-11-28-academy/22550 "2025-11-28T09:57:22Z")

</div>

New Webinars/Events Leadership in Construction Project Management (Part 1/6): Defining the role and objectives of a project manager Leadership in Construction Project Management (Part 2/6): Understanding the detail of t…

---

## [Release Notes up to 2025-11-22 Contract Management Sprint 129](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-11-22-contract-management-sprint-129/22546)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [25 November 2025 15:45 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-11-22-contract-management-sprint-129/22546 "2025-11-25T15:45:29Z")

</div>

This release contains improvements and bug fixes. \* New + Improved \* Improvements We have remove the Related Model column from Contract Amount Changes \[ContractOtherPriceChange\] and Contract Date Changes \[ContractOther…

---

## [Release Notes up to 2025-11-08 Contract Management Sprint 128](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-11-08-contract-management-sprint-128/22537)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [11 November 2025 10:10 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-11-08-contract-management-sprint-128/22537 "2025-11-11T10:10:11Z")

</div>

This release contains improvements and bug fixes. \* New + Improved \* Improvements Determine the notifying/replying party based on the party associated with the user who communicated a notice/reply and allow override vi…

---

## [Release Notes upto 2025-10-31 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-10-31-academy/22524)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [31 October 2025 09:25 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-10-31-academy/22524 "2025-10-31T09:25:15Z")

</div>

New Webinars/Events Contractor Obligations under JCT D&B Contract for Subcontracting and H&S An Overview of Risk Management (Part 2) NEC4 TSC (Part 1/6): How the TSC is structured – the options and documents NEC4 TSC (P…

---

## [Release Notes up to 2025-10-25 Contract Management Sprint 127](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-10-25-contract-management-sprint-127/22518)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [28 October 2025 10:00 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-10-25-contract-management-sprint-127/22518 "2025-10-28T10:00:46Z")

</div>

This release contains new features, improvements and bug fixes. \* New + Improved \* New Features Packaged Contracts - Alternative Batch Payment Applications and Certificates - Split by Project Order \*\* Add the capabilit…

---

## [Release Notes up to 2025-10-11 Contract Management Sprint 126](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-10-11-contract-management-sprint-126/22509)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [15 October 2025 15:24 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-10-11-contract-management-sprint-126/22509 "2025-10-15T15:24:09Z")

</div>

This release contains new features, improvements and bug fixes. \* New + Improved \* New Features Allow filtering on the contracts list when adding a user to multiple contracts Add count of outstanding actions per party …

---

## [Release Notes upto 2025-09-30 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-09-30-academy/22499)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [30 September 2025 10:29 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-09-30-academy/22499 "2025-09-30T10:29:30Z")

</div>

New Webinars/Events Payment and the Construction Act Overview of the JCT Design and Build Contract JCT Design & Build 2024: The Main Changes FIDIC Yellow Book 1999 12-part Series How to Produce and Update your Programme…

---

## [Release Notes up to 2025-09-27 Contract Management Sprint 125](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-09-27-contract-management-sprint-125/22498)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [30 September 2025 10:21 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-09-27-contract-management-sprint-125/22498 "2025-09-30T10:21:33Z")

</div>

This release contains new features, improvements and bug fixes \* New + Improved \* New Features Actions is a new menu option now available to all users A single register of outstanding actions across all contracts y…

---

## [Release Notes up to 2025-09-13 Contract Management Sprint 123 124](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-09-13-contract-management-sprint-123-124/22491)

<div class="topic-metadata">

**Author:** [@LilyPage](https://reachback.builtintelligence.com/u/LilyPage)\
**Replies:** 0\
**Last updated:** [16 September 2025 16:10 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-09-13-contract-management-sprint-123-124/22491 "2025-09-16T16:10:55Z")

</div>

This release contains bug fixes, new features, improvements, and updates to some aggregate reports. \* Bug fixes Notifications pages were occasionally timing out ‘Actions - All’ report was erroring on some rows for …

---

## [Release Notes upto 2025-08-29 Academy](https://reachback.builtintelligence.com/t/release-notes-upto-2025-08-29-academy/22480)

<div class="topic-metadata">

**Author:** [@richardhodson](https://reachback.builtintelligence.com/u/richardhodson)\
**Replies:** 0\
**Last updated:** [29 August 2025 08:10 UTC](https://reachback.builtintelligence.com/t/release-notes-upto-2025-08-29-academy/22480 "2025-08-29T08:10:16Z")

</div>

New Webinars/Events An Overview of the NEC4 ECS The Five Methods of Dispute Resolution under JCT D&B16 An Introduction to the Building Safety Act An Overview of the FIDIC Red Book JCT SBC 16 12-Part Series Default and T…

---

## [Release Notes up to 2025-08-16 Contract Management Sprint 122](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-08-16-contract-management-sprint-122/22464)

<div class="topic-metadata">

**Author:** [@liz\_exley](https://reachback.builtintelligence.com/u/liz_exley)\
**Replies:** 0\
**Last updated:** [19 August 2025 09:05 UTC](https://reachback.builtintelligence.com/t/release-notes-up-to-2025-08-16-contract-management-sprint-122/22464 "2025-08-19T09:05:36Z")

</div>

This release contains a new feature and several improvements. \* New + Improved \* New Features We have added a checkbox selector column and a new button to the Contract Users page to allow a System Owner/System Administ…

[Next page](https://reachback.builtintelligence.com/c/built-intelligence-roadmap/released/84.md?page=1)
