Where can one obtain more information regarding Building Regulations with regard to electrical installation?

Further guidance is available from the following sources:

·     IET (Institution of Engineering and Technology) at [http://www.iee.org/publish/wireregs/partp.cfm](http://www.iee.org/publish/wireregs/partp.cfm)

·     the NICEIC (National Inspection Council for Electrical Installation

·     Contracting) at [www.niceic.org.uk](http://www.niceic.org.uk/);

·     the ECA (Electrical Contractors’ Association) at [www.eca.co.uk](http://www.eca.co.uk/).