What is the best way of determining how much unsuitable material should be removed before commencing building work?
Planning and Architecture
Part C Site prep
Build_Regs_Advisors
15 February 2013 12:34
2
It is generally recommended to achieve this by undergoing a site investigation.
Related Topics
Topic
Replies
Views
Activity
What is involved in preparatory investigation of a potential building site?
Part C Site prep
1
470
15 February 2013
Are there any particular processes that should be included within the risk assessment for a building construction site?
Part C Site prep
1
455
15 February 2013
With regard to a building site, when is a geotechnical and geo-environmental investigation to be considered?
Part C Site prep
1
409
15 February 2013
What is the purpose of a preliminary building site assessment?
Part C Site prep
1
502
15 February 2013
If the removal of debris from a building site after a construction has been completed involves radioactive or otherwise contaminated materials, are any special provisions required?
Part D Toxic substances
1
406
14 February 2013