ReachBack
Does a client or an architect hold copyright over a design?
JCT Contracts
JCT_Experts
5 February 2013 11:25
2
The copyright is held by the architect who produced the design.
Related Topics
Topic
Replies
Views
Activity
If a designer has produced a set of full drawings and is paid for them, and the client subsequently sells the site on, is the new owner legally able to use the drawings to build on the site?
JCT Contracts
1
425
5 February 2013
If a nominated sub-contractor is involved in a design, can the contractor be held liable for it?
JCT Contracts
1
371
5 February 2013
If an architect submits a faulty design, but the contractor constructs the project ineptly, who will be held liable?
JCT Contracts
1
418
5 February 2013
Does an architect have any legal obligation to check a contractor's setting out should (s)he be requested to do so?
JCT Contracts
1
643
5 February 2013
Can a contractor be held liable for something done under his / her initiative?
JCT Contracts
1
344
5 February 2013