What is the minimum level of cover or minimum level of indemnity the Contractor has to provide for liability for liability for injury to or death of employees of the Contractor as a result of their employment in connection with the contract?

+1 vote
354 views

What is the minimum level of cover or minimum level of indemnity the Contractor has to provide for liability for liability for injury to or death of employees of the Contractor as a result of their employment in connection with the contract?

asked Oct 11, 2012 in Risk and Insurance by BuiltIntelligence (870 points)  

1 Answer

+1 vote
 
Best answer

The Contractor has to provide cover for whichever is the greatest between: the amount required by the applicable law; and the amount stated in the Contract Data (see Clause 84.2 Insurance table).

answered Oct 11, 2012 by BuiltIntelligence (870 points)  
edited Nov 9, 2012 by Rob Glasspool