Does the Contractor have to provide insurance cover for liability for loss of or damage to property caused by activity in connection with the contract?

+1 vote
334 views

 Does the Contractor have to provide insurance cover for liability for loss of or damage to property caused by activity in connection with the contract?

asked Oct 10, 2012 in Risk and Insurance by BuiltIntelligence (870 points)  

1 Answer

+1 vote
 
Best answer

Yes. Liability for loss of or damage to property caused by activity in connection with the contract is included in the Insurance Table (see Clause 84.2).

answered Oct 10, 2012 by BuiltIntelligence (870 points)