What is the minimum amount of cover or minimum level of indemnity the Contractor has to provide for loss of or damage to Equipment?

+1 vote
342 views

 What is the minimum amount of cover or minimum level of indemnity the Contractor has to provide for loss of or damage to Equipment?

asked Oct 10, 2012 in Risk and Insurance by BuiltIntelligence (870 points)  

1 Answer

+1 vote
 
Best answer

The Contractor has to provide insurance cover for the replacement cost for loss of or damage to equipment (see Clause 84.2).

answered Oct 10, 2012 by BuiltIntelligence (870 points)