FIDIC: Are safety barricades themselves considered as Temporary Works?

0 votes
asked Oct 17, 2017 in Construction Contract (Red Book) by anonymous   5 19

1 Answer

0 votes
Best answer
I can think of multiple different types of safety barricades some of which could be temporary works (particularly around traffic management) and some of which would be permanent works (eg central reservation barrier in a road). Therefore it will depend on the nature of the work and its overall purpose.
answered Dec 1, 2017 by Rob Horne (16,220 points)