If a product is found to be defective, can an architect be held liable regarding its specification?

Specification is certainly something for which an architect can be held liable. The matter of whether or not the architect will be held legally liable will be predicated on whether an architect specified something that was inherently defective, as opposed to a suitable item which developed or contained defects.